Martinez Marina and Historic Fishing Pier martinez marina and historic fishing pier MARTINEZ MARINA AND HISTORIC FISHING PIER For nearly 20 years, Anchor QEA has supported the renovation and maintenance of the City of Martinez’s marina and historic fishing pier. Anchor QEA led the engineering design for a new seawall, habitat restoration, and multiple dredging episodes; provided geotechnical, wind, and wave studies; and assessed the condition of docks and piles. Anchor QEA also led the permitting […] Civil Engineering civil-engineering civil engineering CIVIL ENGINEERING Coastal Resilience coastal-resilience coastal resilience COASTAL RESILIENCE Construction Management construction-management construction management CONSTRUCTION MANAGEMENT Geotechnical Engineering geotechnical-engineering geotechnical engineering GEOTECHNICAL ENGINEERING Habitat Restoration and Mitigation habitat-restoration habitat restoration and mitigation HABITAT RESTORATION AND MITIGATION Modeling modeling modeling MODELING Natural Resources natural-resources natural resources NATURAL RESOURCES Planning and Permitting permitting-and-regulatory-compliance planning and permitting PLANNING AND PERMITTING Site Investigation site-investigation site investigation SITE INVESTIGATION State and Local state-local state and local STATE AND LOCAL City of Martinez city-of-martinez city of martinez CITY OF MARTINEZ
Point Roberts Marina Maintenance Dredging point roberts marina maintenance dredging POINT ROBERTS MARINA MAINTENANCE DREDGING Why It Matters Point Roberts Marina’s entrance structures partially interrupt the natural westward movement of sediment along the shoreline. As a result, beach sediment accumulates east of the marina entrance, while the shoreline to the west experiences erosion. Annual bypass dredging moves this sediment around the marina entrance to maintain natural sediment transport and support […] Habitat Restoration and Mitigation habitat-restoration habitat restoration and mitigation HABITAT RESTORATION AND MITIGATION Natural Resources natural-resources natural resources NATURAL RESOURCES Planning and Permitting permitting-and-regulatory-compliance planning and permitting PLANNING AND PERMITTING Public, Agency, and Tribal Facilitation public-agency-and-tribal-facilitation public, agency, and tribal facilitation PUBLIC, AGENCY, AND TRIBAL FACILITATION Ports and Waterfront ports-harbors ports and waterfront PORTS AND WATERFRONT Washington washington washington WASHINGTON Point Roberts Marina point-roberts-marina point roberts marina POINT ROBERTS MARINA
Scorpion Anchorage Pier Replacement scorpion anchorage pier replacement SCORPION ANCHORAGE PIER REPLACEMENT The National Park Service (NPS) replaced and relocated Scorpion Pier and its access road to improve park operations and visitor experience and provide safe access to Santa Cruz Island—the most visited island in Channel Islands National Park.
The project addressed the deficiencies with the pier and road by creating a new pier and access road approach in a better location. In addition, the project design included features to address flooding and future projected changes in sea level without the need for a full replacement, and it accommodated construction on an island and in a volcanic rock environment.
Construction Management construction-management construction management CONSTRUCTION MANAGEMENT Natural Resources natural-resources natural resources NATURAL RESOURCES Planning and Permitting permitting-and-regulatory-compliance planning and permitting PLANNING AND PERMITTING Risk Assessment risk-assessment risk assessment RISK ASSESSMENT Federal federal federal FEDERAL National Park Service national-park-service national park service NATIONAL PARK SERVICE